SCR
Retrofit –AES Cayuga, LLC, Lansing, NY, USA
IDS, Engineering
subcontractor to Foster Wheeler Corp, for retrofit of Unit 1 with
selective Catalytic Reduction (SCR) Unit 1 is a normal 160 MWe
Pulverized coal fired steam generator that was put into service in 1995.
To meet current and future NOx emission limits, significant NOx
reduction was required therefore an SCR was selected as the appropriate
technology. Space for the SCR was limited with SCR supply and return
flues being routed in only a 12-foot space between the boiler and
precipitator.
IDS provided Foster
Wheeler with Plant Design, Engineering, Design/Drafter, and Construction
Management Services for the majority of the main supporting systems
related to the SCR Retrofit.
|
 |
IDS’s Scope of work included the
following systems and components
-
SCR Reactor Housing
-
SCR Flue Gas Ducting System
-
Ammonia Storage and
Handling
-
Ammonia Piping System
-
Economizer Bypass Ducting
-
Monorail System
-
SCR Bypass Duct
-
Soot blower System
-
Structural Supports &
Piping Supports
-
Auxiliary Systems
(compressed air and dampers)
|
|
IDS’s
responsibilities included developing the SCR General Arrangement
drawings, Assembly & Installation Drawings and all Shop Fabrication
drawings
IDS performed all
the required Structural Engineering Piping Stress and Code Calculations
for all the systems in accordance with the applicable ASME Boiler Codes
and Standards including, determining all SCR load calculations, thermal
expansion movements, structural steel & platform loads, and developing
all required pipe & duct support design details.
IDS also provided on
site Construction Management support during the construction phase of
the project. IDS personnel assisted Foster Wheeler with plant walk downs
of mechanical systems and equipment, field design and engineering
recommendations, equipment interference checking, construction deviation
report tracking, scheduling and document control. |
|
|